Spaghetti Bowl Xpress (SBX) Traffic Control Update Week of October 31

Spaghetti Bowl Xpress (SBX) Traffic Control Update Week of October 31

Traffic control and detour maps are available here. Construction operations are weather dependent and subject to change.

NOTE:

To provide a smoother interstate surface, next week crews will continue repairs to surface cracking and potholes on I-580 between Mill Street and Moana Lane. In addition to continuing lane and ramp closures near the spaghetti bowl, drivers should anticipate intermittent overnight lane and ramp closures on I-580 between Mill Street and Moana Lane through December for these important roadway repairs.

Construction crews work on the Spaghetti Bowl as nighttime construction continues on I-580.

Spaghetti Bowl nighttime construction continues on I-580.

Reno Spaghetti Bowl Ramp Closures

Ramps will be CLOSED intermittently overnight from 8pm to 6am from
Monday, November 1 to Friday, November 5. Please use marked detour routes.

  • Eastbound I-80 to northbound US-395
  • Eastbound I-80 to southbound I-580

NOTE: Both ramps will periodically be closed at the same time, with detour available (follow signage).

Overnight I-80 Lane Reductions

Overnight lane reductions on eastbound I-80 between Keystone Avenue and the Spaghetti Bowl from 8pm to 6am, Monday, November 1 to Friday, November 5.

Overnight I-580 Lane Reductions

Overnight lane reductions on southbound I-580 between the Spaghetti Bowl and Moana Lane from 8pm to 5am from Monday, November 1 to Friday, November 5.

Southbound I-580 Second Street/Mill Street Off Ramps

Access to Second Street and/or Mill Street will be intermittently closed from the southbound I-580 Second Street/Mill Street off ramp overnight from 8pm to 6am from Monday, November 1 to Friday, November 5. Access to one route—either Second Street or Mill Street—will be available.

Kietzke Lane Closures

Kietzke Lane from Kuenzli Street to Galletti Way will be closed overnight from 8pm to 6am in both directions from Monday, November 1 to Friday, November 5.

Eastbound I-80 Wells Avenue On Ramp Closure Through November

The Eastbound I-80 Wells Avenue on ramp is temporarily closed 24 hours/day, seven days/week until Friday, November 26. The closure is needed for the safety of drivers and workers while crews reconfigure the new eastbound I-80 to southbound I-580 ramp.

CONTACT US WITH ANY QUESTIONS

TEXT: 797979 with “SBX” for project updates via text
FACEBOOK: www.facebook.com/NevadaDOT
TWITTER: @nevadadotreno
HOTLINE: 775-636-4202
EMAIL: info@ndotspaghettibowl.com
WEBSITE: ndotspaghettibowl.com

Nighttime construction hours are approximately 8 pm to 6 am. Daytime construction hours are approximately 7 am to 5 pm. Drivers can expect reduced speeds through the work zone. All construction activities and times are subject to change and weather dependent.